City Council adopts South 200th Street corridor Study

The study presents two options for the City to consider when planning for long-term improvements to the corridor. Option 1 includes one driving lane in each direction with a continuous center-turn lane, bicycle lanes and wider sidewalks. Option 2 maintains two driving lanes in each direction, does not include a center turn lane, adds bicycle lanes and wider sidewalks and would result in acquiring significant property to widen the roadway and fit these improvements.